Water Supply to Sadiyat Island

Project No. N 5807. Project Name – Water Supply to Sadiyat Island.
Client – TRANSCO,
Consultant – Tebodin.
Main Contractor – Linden Berg Emirates.
1. Binary was engaged by Linden Berg for Fabrication, welding and NDT of MITRE Bends for DN 1200 CS Pipeline for submarine crossing interconnection works.
2. Binary was also engaged in the same project for Fabrication, welding and NDT of DN 1200 CS Pipeline interconnection works for an extend of 480mtr.

Abu Dhabi Airport Project

Project No. SPC /11.
Project Name – Abu Dhabi Airport Project
Client – Abu Dhabi Air Port Authority
Consultant – Dorsch Consult
Main Contractor – Bin Ham Electromechanical Co LLC.
Supply, Fabrication, Cement lining, External coating and Erection of DN 400 CS irrigation line refurbishment works.

EPC Contract for Al Ain Water Transmission Scheme Pipeline

Project No . N – 4381 B
Project Name – EPC Contract for Al Ain Water Transmission Scheme Pipeline.
Client – TRANSCO,
Consultant – Tebodin.
Main Contractor – Astraco Construction.
Cutting, Fabrication and D.I. SPIGOT ENDS – BEAD WELDING of DN 1600, 1400, 1200, 1000, 900, 800, 600, 400, 300. (KUBOTA & ACIPCO).

Automated waste Collection System

Project No . AD01- Yas Island.
Project Name – Automated waste Collection System.
Client – ALDAR,
Main Contractor – ENVAC.
Binary was engaged by M/S. ENVAC for fabrication, welding of DN600 pipeline for automated waste collection system in Yas Island for an extent of 8.4 km.

Water supply to Al Yas Island

Project No .N 4277.
Project Name – Water supply to Al Yas Island.
Client – TRANSCO.
Consultant – Tebodin.
Main Contractor – SEDE.
Fabrication, Welding, NDT of DN 1200 CS Pipeline – 620mtr for YAS – YAS submarine crossing.

Water supply Scheme to Jazairat Al Hamra

Project No .N 4028.
Project Name – Water supply Scheme to Jazairat Al Hamra.
Client – TRANSCO.
Consultant – Tebodin.
Main Contractor – Tec ton Engineering and Construction LLC.
Project Name – Water supply Scheme to Jazairat Al Hamra.

Fujairah Diba Pump station

Binary was engaged for Fabrication, Welding AND Installation of 60’’, 48’’, 36’’ and 30’’ Dia Weld Joints, Profile Cutting, fabrication,
Welding and installation of 60’’ x 30’’ branch with pad plate, Cutting and Removal existing pipes, Hydra testing flashing and disinfection of pipelines.


ADCO – Fire Simulator Tank and piping work

Supply, Fabrication, External Painting, Erection and testing if Steel Tank with all accessories, stair way us and platforms as per
general arrangement and orientation of Fire Simulator Tank Size Height 8000mm with 15000mm Dia in Habshan Bab area.

Supply, fabrication and HD Galvanizing Chequered Plate Cover for valve Pits.
Supply, Fabrication and Erection for structural work of Simulators.
Supply, Fabrication, Erection and Painting Internal & External Large Outlet.
Supply, Fabrication, Erection and Painting of Kerosene Storage Tank.
Fabrication, Erection, Welding and NDT – SMAW 2’’ and above.
Fabrication, Erection, Welding and NDT – GTAW 2’’ and below.

ADCO – CO2 Project Habshan Bab Pipeline ½’’ to 10’’

Binary was engaged for Fabrication, Welding and Installation of ½’’ to 10’’ Dia
Weld Joints, CS, SS, Cladding and Duplex pipelines.


Al Ghurair Iron and Steel Icad -1 New Plant Utility Pipe

Binary was engaged for Supply, Fabrication, Welding, Painting, Installation and Hydro
testing ½’’ to 14’’ Dia Weld Joints, CS and SS pipelines.


Dusup – Dubai Water Authority - New Pipe line

Binary was engaged for Fabrication, Welding, NDT, Painting, Installation and Hydro testing 2’’ to 36’’ Dia Weld Joints, CS pipelines.
Binary was engaged for Fabrication, Welding, Painting and Installation pipe saddle support for up to 36’’ pipeline.
Binary was engaged for Fabrication, Welding, Painting and Installation pipe carrying bridge 14mtr Height for up to 36’’ pipeline.

About us

We build the bridge between the world of ideas and the delivery of products.

EFFETCTIVE TEAM WORK

BINARY ENGINEERING & CONSTRUCTION WORKS LLC is determined to be one of best and most preferred companies to cater fabrication needs for various oil field services, companies and building construction industry.

Engineers & Workers
Binary
Working in Remote Environments

BINARY ENGINEERING & CONSTRUCTION WORKS LLC relies on its highly skilled manpower and tremendous capabilities to achieve and retain confidence of our valued customers.

Our project

Binary

Our Customers Says

A satisfied customer is the best business strategy of a